The client approached us with the idea of bringing their newly purchased property to life and turning it into their dream family home. The property was built in the mid-20th Century and had not been updated much since.
Due to the requirement for a free-flowing open plan ground floor. The structural complexity of the project was a challenge that had to be resolved through the production of complex construction details.
Key Information
Client: Millington
Sector: Domestic / Residential
Size: Detached 4-Bedroom Dwelling
Value: £ Not Disclosed
Location: Newcastle-under-Lyme
Team Member: Dan Swingewood
Status: Under Construction
Overall, the project saw huge alterations being made to the existing property, adding a 2-storey side extension, single storey rear extension with a 32m2 green roof along with major internal alterations.
Project is ongoing and final touches are due to be completed in late 2023
" The team at Mode have been great throughout, with innovative ideas from the outset, being responsive and helpful when queries and change of proposals arose and keeping me informed of areas of risk regarding planning then adjusting plans accordingly. The team at Mode listened carefully to the brief and came back with a range of options that allowed the designs to evolve, which was highly appreciated."